
Planning consultants in London.
Chelsea · SW3 · a roof terrace with an outdoor kitchenCompleted work, photograph
Feasibility, planning applications and appeals, handled by the team that also draws the home.
Drawn for consent by the people who will build it.
Planning consultancy covers feasibility, planning applications and appeals. We are NU Projects, design and build in Fulham SW6 since 2010. Our architectural team draws the application, and the same team costs the build. Planning fees are priced per project, and set out before you commit. Call 020 7731 6841 to talk the work through.
Planning permission depends on the property, the work and local policy. Some schemes qualify as permitted development. We check eligibility against your actual building.
Our architectural team prepares feasibility studies and planning applications. Appeals follow, where a scheme needs one. The same team also costs and builds the work. A design is drawn to be buildable.
Allow time for surveys, design and validation, before the council’s own assessment begins. Consent is not always an immediate site start. We check the conditions attached, and the other approvals still needed.
What the work includes
- Feasibility studies and planning applications
- Appeals, where a scheme needs one
- Permitted development checked against your property
- Drawings made by the team that also builds
- Conditions and other approvals checked before site start
- Planning consultants by area
- Planning consultants in Fulham, Planning consultants in Kensington and Chelsea
- Where we work
- Fulham, Chelsea, Kensington, Knightsbridge, Belgravia, Mayfair, Notting Hill and Holland Park, Chiswick, Wandsworth, Putney and Barnes, Hampstead and St John’s Wood, Weybridge, Cobham and Oxshott, South Kensington, Marylebone, Bayswater and Maida Vale, Pimlico and Westminster, Battersea and Clapham, Richmond, Twickenham and East Sheen, Islington, Highgate and Primrose Hill, Greenwich, Dulwich, Camden, Wimbledon, Bermondsey, Brixton, Ealing, Acton, Hammersmith and Brook Green, Earl’s Court, Queen’s Park and Kensal Rise, Fitzrovia and Bloomsbury
Consent is not always a site start. We check the conditions first.
See it built, in Fulham.
Before you apply.
Further reading, from the journal
Do I need planning permission for my project?
It depends on your property, the proposed work and any planning restrictions in place.
Some schemes qualify as permitted development. We always check eligibility against your actual building before relying on that route.
How long will planning permission take?
Allow time for surveys, design and validation before the council’s assessment period begins.
Requests for information, consultation and revisions can extend the timeline. Do not treat an indicative decision date as a guaranteed site start.
Can we start as soon as planning permission is granted?
Not necessarily. Read the decision notice carefully for any conditions attached.
Check the other approvals and agreements the works need. Design, technical and contractual readiness are separate questions.
On our Kensington houses, the borough then paused new basements for a year.
How much does a planning consultant cost?
Our planning fees are priced per project, from the actual scope.
Our quantity surveyor sets them out before you commit.
Tell us what you want to build.
Your name and one way to reply are enough. It goes straight to the studio.
