NU MEPMechanical, electrical and plumbing

MEP services for prime London homes.

Heating, hot water, power, ventilation and controls, designed and installed by our own team.

Swimming pool lined in marble with a lit ceiling above.
Knightsbridge · SW1, a pool room on our own heating, ventilation, water and lightingCompleted work, photograph

The sectionFour systems

A London townhouse, in section.

The drawing shows four systems. We cover six.

Power, water, heating and cooling leave the plant room. They run to every floor of the house. Switch a system off to read the others on their own.

BEDROOMBEDROOMFAMILY BATH PRINCIPAL BEDROOMEN SUITE RECEPTIONKITCHEN CINEMAUTILITY BEDROOMBEDROOMBATH PRINCIPALEN SUITE RECEPTIONKITCHEN CINEMAUTILITY SECONDFIRSTGROUNDLOWER GROUND 2ND1STGRDLG Consumer unit, Plant room Socket and lighting circuit, Cinema Home control panel, Reception Lighting and power, Principal bedroom Lighting and power, Second floor bedroom Cold water main, Incoming supply Hot water cylinder, Plant room Kitchen supply, Ground floor En suite, First floor Family bathroom, Second floor Soil and vent stack, Drainage Air source heat pump, Plant room Underfloor heating manifold, Lower ground Underfloor heating manifold, Ground floor Underfloor heating manifold, First floor Underfloor heating manifold, Second floor Comfort cooling condenser, Roof plant Comfort cooling fan coil, Reception Comfort cooling fan coil, Principal bedroom Comfort cooling fan coil, Second floor bedroom Heat recovery ventilation unit, Plant room Supply air grille, Ground floor Supply air grille, First floor Supply air grille, Second floor PLANT ROOM
Second
Bedroom, bedroom, family bath
First
Principal bedroom, en suite
Ground
Reception, kitchen
Lower ground
Cinema, utility, plant room

Indicative routing, drawn for illustration. It is not a construction drawing.

What we coverSix systems

Six systems, one team.

01Heating and hot water

Boilers, heat pumps, underfloor heating and emitters, sized for the house. We assess floor buildup, heat output and control zones first. Simultaneous demand across several bathrooms is calculated, not guessed.

02Electrical

Power, lighting circuits, distribution and testing, by NICEIC approved engineers. We check existing capacity against the loads you are adding. Solar, battery storage and car charging are reviewed on site.

03Plumbing and drainage

Incoming supply, storage, hot water, waste and drainage, coordinated with the structure. Gas work is carried out by Gas Safe registered engineers. Routes are planned before floors and ceilings close.

04Ventilation and cooling

Ventilation moves air, cooling removes heat. A comfortable home needs both, especially after insulation work. Concealed units need ceiling or joinery space, duct routes and maintenance access.

05Lighting and controls

Lighting, heating, blinds, audio visual and network, on controls you will actually use. We agree the functions early, then wire for them before first fix. Handover includes training on the system.

06Aftercare

NU MEP covers planned maintenance, diagnostics and reactive repairs. Testing, commissioning and upgrades sit in the same team. Electrical testing, EICR support, certification and gas servicing are all handled.

Wine room in walnut with racked bottles and a table.
Knightsbridge · SW1, a wine room held at one temperatureCompleted work, photograph

Every one of these is designed in house, then installed by our own engineers. One team holds the drawings, the plant and the certificates.

Fire door inspections and bespoke fire doors, made with Cochrane Bespoke, sit inside this team too.

How it runsThree rules

Designed early, tested at the end.

Design first

Services are designed before ceilings, floors, cabinetry and layouts are fixed. Early decisions on routes and plant protect space and finishes.

Coordinate early

We resolve structure and services with the engineers, before anyone is on site. Plant and distribution space is reserved during concept design.

Test and commission

Testing and commissioning sit in the scope, with records and a demonstration. Installed equipment is not the same as a commissioned system.

Living room with a fireplace, tall windows and a chandelier.
Knightsbridge · SW1, every circuit behind the plaster is oursCompleted work, photograph

Who runs it

Run by Wayne Hockham.

MEP Director · Over 20 years in construction

Wayne has over two decades in construction. He started with an apprenticeship in plumbing and heating. He then built his knowledge across the whole mechanical and electrical field.

That route from the tools upward shapes how he runs projects. He understands how services are designed, coordinated and installed. Clients get clear, dependable guidance rather than jargon.

  • Gas Safe registered
  • NICEIC approved
  • Design and install in house

Certificates are issued in the client’s name and kept with the handover records.

Book NU MEPFourteen areas

Book NU MEP, fast.

Pick your area to see travel, charges and parking before anyone is booked. The base is in Fulham, SW6.

Fulham Chelsea South Kensington Notting Hill Hammersmith Knightsbridge Belgravia Mayfair Westminster St John’s Wood Whitechapel Clapham Putney Wandsworth

The list below is the sure way to pick an area. Every tile is a full size target. The map takes a press too, and it names the areas that fit.

Drawn to the real map of London, at one scale. The gold line runs from the base to the area you pick. The small drawing is Greater London, and its bar is ten miles. The gold box marks the part this map covers.

West London

Chelsea

Prime residential streets, lateral apartments and townhouses. Finishes are high value and the homes are often occupied.

Postcode
SW3 and SW10
London area
West London
From the base
1.6 miles
Peak travel
15 to 30 mins
Property value, market
£1,350 / sq ft sale value
Property value, prime
£1,500+ / sq ft sale value
Local authority
Kensington and Chelsea
Congestion zone
Outside the zone
Road charge
No charge
Daily parking
Borough tariffs vary
Access note
Park in a pay by phone bay, then check the stay.

These two are sale values, not build rates. Every other rate on this site is a build rate.

MEP focus

  • Leak and drainage support
  • Pump and valve repairs
  • Consumer unit reviews
  • Aftercare and defects

Charges and parking

  • No Congestion Charge for a typical Chelsea visit.
  • Visitor parking uses pay by phone bays or off street car parks.
  • Tariffs and maximum stays vary by bay.
  • Parking is recharged at cost.
Attendance £130 plus VAT

The call out charge, before labour, parts, parking and road charges.

Plan a visit

Tell us the fault and the address.

Your name and one way to reply are enough. It goes straight to the MEP team.

Which engineer do you need?

QuestionsMEP

Asked every week.

What does MEP mean?

Mechanical, electrical and plumbing. It is the heating, hot water, ventilation, cooling, power, controls and drainage.

These systems need space and coordination inside the architecture. We design them in house, alongside the drawings.

When should the services be designed?

Before ceilings, floors, cabinetry and key layouts are fixed.

Deciding routes and plant early avoids losing space or cutting into finished work later. We reserve that space during concept design.

How do I know the systems work properly at handover?

Testing and commissioning are written into the scope from the start.

You get the commissioning records, a room by room demonstration and training. Installed equipment is not the same as a balanced system.

Does NU MEP handle repairs and servicing as well as projects?

Yes. NU MEP covers planned maintenance, diagnostics, reactive repairs, testing, commissioning and upgrades.

Tell us the fault and the equipment details when you call. We will confirm scope and attendance for your property.

Next

Know the number before the visit.

A whole project, or one system put right. Both start with a call.

Open the calculatorSee every serviceCall +44 20 7731 6841