Marylebone · W1
Marylebone listed apartment
A modern marble kitchen, set inside Georgian rooms.

The workApartment
What we did.
- Luxury renovation
- Interior design
- Kitchen
- Residential fit-out
- Project management
A first floor apartment in a Grade II listed building in Marylebone. NU Projects renovated it and designed the interior.
The rooms are tall and full of light. The period fabric was kept. That means the ornate plasterwork, the marble chimneypieces, the panelling and the shuttered sashes.
The double reception room holds a contemporary kitchen. A marble waterfall island sits under the period ceiling. An arched opening leads through to the drawing room.
One bedroom completes the apartment. The old fabric stays, and the new work sits inside it.
ServicesConstructionInterior design









From the journal402 notes, free to read
How work like this gets done.
-
3 min read
Snagging and handover on a London renovation
Practical completion is not the day everything is done. What snagging covers, how a defects period differs from a warranty, what a handover pack needs.
-
3 min read
Stage payments on a London renovation
How stage payments and valuations work on a London renovation, what retention holds back, how provisional sums differ from contingency, and what to ask.
-
3 min read
The Fulham house that started in a coffee queue
A basement, a rear extension and a full renovation in Fulham. One contract and one team. Three years from the first drawing to handover.
Start a conversation
Tell us about your home.
Your name and one way to reply are enough. It goes straight to the studio.

