Architecture · Drawn in house
Architecture in London.
Feasibility to construction drawings, made by the team that also builds.
01What it covers
Architecture, explained.
NU Projects designs prime London homes, then builds them. Drawings are made by a team that knows what they cost. That closes the gap between a design and a price.
We take a home from first concept to construction drawings. Planning and building control run alongside the design. Structural engineers and specialist consultants are coordinated by us, not by you.
A feasibility study tests whether the brief, the property and the budget fit together. Planning drawings explain the scheme, for assessment. Construction drawings carry the detail that lets it be priced and built.
- Feasibility studies and concept design
- Planning drawings and applications, prepared in house
- Building regulation and construction drawings
- Structural engineers coordinated by us, not by you
- Permitted development checked against your actual property
- Drawings made by the team that also builds
02Our own photograph
Seen on site.

03Built by us
Architecture, delivered.
04Part of one contract
Part of our architecture service.

01 · Drawn in house
Architecture
The people who draw your home also price it and build it.
See the whole serviceQuestionsArchitecture, answered
What people ask about architecture.
What does a feasibility study tell me?
It tests whether your brief, property, likely approvals, budget and programme fit together.
We compare options and identify any missing surveys, before developing your preferred scheme.
What is the difference between planning drawings and construction drawings?
Planning drawings explain the proposed development, for assessment.
Construction information needs more coordination and detail, covering structure, services, materials and junctions. This is what lets the work be priced and built.
Do I need planning permission for my project?
It depends on your property, the proposed work and any planning restrictions in place.
Some schemes qualify as permitted development. We always check eligibility against your actual building before relying on that route.
How long will planning permission take?
Allow time for surveys, design and validation before the council’s assessment period begins.
Requests for information, consultation and revisions can extend the timeline. Do not treat an indicative decision date as a guaranteed site start.
Can we start as soon as planning permission is granted?
Not necessarily. Read the decision notice carefully for any conditions attached.
Check the other approvals and agreements the works need. Design, technical and contractual readiness are separate questions.
Next step
See a range in a minute. Then send us the address for a proper number.
From the journal402 notes, free to read
Architecture, written up.
-
3 min read
Planning permission for a London extension: timing and refusals
A decision date is not a start date. What sits either side of the council decision, plus pre-application advice and refusals.
-
6 min read
What a main contractor owes an architect at tender
Six things a tender return should give an architect. Bill of quantities, method statements, shop drawing sign off and subcontractor detail.
-
6 min read
Architect vs design & build: which should you choose?
Compare architect-led and design-and-build routes for a London renovation, including accountability, cost, programme, design quality and risk.
Architecture
Tell us about your home.
Send your name, the area and one way to reply.

