
Structural engineers in London.
Engineered and monitored · the dig, under temporary proppingOn site, photograph
Structural engineers coordinated by us, so drawings and calculations arrive on the same programme.
How the house is held up, drawn before it is built.
Structural engineers give a design its calculations, on the same programme as the drawings. We are NU Projects, design and build in Fulham SW6 since 2010. We coordinate the engineer for you, as part of the design. Engineering fees are priced per project, from the actual scope. Call 020 7731 6841, and a budget estimate typically follows within seven days.
The architectural drawings show what a design achieves. Structural drawings show how it is held up. That means the steel and timber carrying the load.
The engineer assesses the property first. Sometimes a wall, ceiling or small dig is opened up, for an accurate reading. That data goes into the calculations for your extension, basement or loft.
The finished drawings are needed for building control, party wall matters and tendering. We bring the engineer in early. Openings and floor depths are tested before the design is fixed.
What the work includes
- Property assessed on site before design is fixed
- Structural drawings and calculations for the scheme
- Coordinated with building control and party wall surveyors
- Brought in early to test openings and floor depths
- Drawings contractors price from, not guess from
- Where we work
- Fulham, Chelsea, Kensington, Knightsbridge, Belgravia, Mayfair, Notting Hill and Holland Park, Chiswick, Wandsworth, Putney and Barnes, Hampstead and St John’s Wood, Weybridge, Cobham and Oxshott, South Kensington, Marylebone, Bayswater and Maida Vale, Pimlico and Westminster, Battersea and Clapham, Richmond, Twickenham and East Sheen, Islington, Highgate and Primrose Hill, Greenwich, Dulwich, Camden, Wimbledon, Bermondsey, Brixton, Ealing, Acton, Hammersmith and Brook Green, Earl’s Court, Queen’s Park and Kensal Rise, Fitzrovia and Bloomsbury
The engineer comes in early. Openings and floor depths are tested before the design is fixed.
Questions about the structure.
Further reading, from the journal
Can I remove a load-bearing wall or chimney breast?
Our engineer assesses what the wall supports and how loads transfer.
We design the temporary works needed and check consents and neighbour matters first.
Do I need structural opening-up investigations?
Sometimes. Hidden construction can change our design assumptions.
We carry out targeted investigations of bearings, foundations or existing alterations first. That informs the final engineering solution.
Why are temporary works important?
A building can need support during alteration, even with a simple final design.
We design and manage the temporary condition as carefully as the permanent work.
In Kensington, props and steel held our structure while the ground came out.
Who are NU’s structural engineers?
Structural design is coordinated by our own team.
The engineer is appointed for the project, and works to our drawings and programme.
Tell us about the house.
Your name and one way to reply are enough. It goes straight to the studio.

