Brick and timber houses around a paved courtyard, blue sky.

Planning consultants in South London.

Fulham · SW6 · Fulham, four new-build houses with basementsCase study

What a South London house can take, tested before anything is drawn. Then we apply, and build what is approved.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

Planning that starts with the borough.

Lambeth
Local Plan, adopted September 2021
Feasibility first
What the house can take
Borough checked
Before a single drawing

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle planning applications and appeals in South London SW and SE. Fees are priced per project by our own quantity surveyor, from the actual scope. Call 020 7731 6841, and a budget estimate typically follows within seven days.

South London spans several councils. Lambeth, Wandsworth, Southwark and Merton each keep their own plan.

We confirm the borough, then check for a conservation area or listing. That decides whether permitted development is even available.

Many rear extensions go through prior approval rather than a full application. Basements and dormers in conservation areas need full consent.

After approval, the conditions are cleared before site starts. Party wall notices go out from the same drawings.

What Lambeth looks for.

Council
London Borough of Lambeth, under its Local Plan adopted in September 2021.
Policy Q11
Extensions are supported in principle, if they stay subordinate to the house.
Permitted development
A single-storey rear extension can reach 3 metres on a terrace without planning. Prior approval can allow 6.
Front lightwells
Only where needed for daylight. In conservation areas, grilles rather than open areas are likely.
After consent
Conditions are checked before site starts. Party wall notices and building control follow from the same drawings.
Wandsworth side
Near Clapham Junction, Wandsworth’s Policy LP5 applies instead. We confirm the borough first.

Source: Lambeth Local Plan 2021, Policy Q11, and the Lambeth Design Guide, Part 4 (2023). Read on 5 October 2026. Policies change, so we read them again for your address.

What planning costs in South London.

Planning in South London is priced per project, from the actual scope.

Our quantity surveyor sets out the fee before you commit.

Open the calculatorThe 2026 cost guide

Which council handles planning in South London?

It depends on the street. Clapham is mostly Lambeth.

Battersea is Wandsworth, Dulwich is Southwark and Wimbledon is Merton.

What is prior approval for a Lambeth extension?

A lighter route for a terrace’s single storey rear extension, up to six metres.

Neighbours are consulted, and it is not open in a conservation area.

Does a front lightwell need planning in Lambeth?

Yes, as part of the basement application.

In conservation areas, a grille is more likely than an open area.

How long does a South London planning application take?

A householder application has an eight week target.

We prepare it fully, so it is valid on day one.

Tell us about your home in South London.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?