Basement media room with dark joinery, a long fire and warm cove lighting.

Basement cinema rooms in Highgate.

Fulham · SW6 · Fulham basementsCompleted work, photograph

Highgate’s wider houses suit a full cinema, not just a snug. Stepped seats need height, so we settle it first.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

A Highgate cinema with room to step the seats.

Wider plots
Room for a lobby and a rack room
DM18 or A5
Haringey or Camden, by address
Since 1967
Haringey’s Highgate Conservation Area

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle basement cinema rooms in Highgate N6, under one contract. A new basement dig typically runs £500k to £900k. Converting an existing basement runs £180k to £300k. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Detached houses in Highgate are wider than central terraces. A cinema can be a proper room, with a lobby that keeps light out. Two rows of seats can step up, if the height allows.

Stepping the back row costs ceiling height. On the Haringey side, DM18 has no fixed storey count. On the Camden side, A5 allows one storey. Either way the rows are drawn before the slab level is fixed.

The cinema is a box within the structure, on its own base. Ventilation runs slowly through lined ducts. The rack sits in a cooled cupboard outside the room. A Construction Management Plan is generally required on the Camden side.

Our nearest house is in N2, reconfigured by NU. Under Fulham houses we built a media room with dark joinery. One team designs, prices and builds yours.

What the council allows in Highgate.

Council
Haringey or Camden, set by the address. Both share the 2017 neighbourhood plan.
Haringey test
DM18 weighs stability, flooding, trees, character and amenity, not a storey count.
Camden storey
Policy A5 allows one storey, and never beneath an existing basement.
Camden garden
On the Camden side, no more than half of each garden.
Camden on site
A Construction Management Plan is generally required for a basement.

Source: Haringey’s Development Management DPD 2017, Policy DM18, and the Highgate Neighbourhood Plan. Read on 25 October 2026. Policies change, so we read them again for your address.

What a basement cinema costs in Highgate.

£180k to £300kConverting an existing basement. A project total, from our 2026 cost guide.

£500k to £900k+Digging a new basement. A project total, from our 2026 cost guide.

Stepped seating adds depth, and depth adds to the dig.

Both figures are project totals. Fees, any audit and VAT are extra.

Open the calculatorThe 2026 cost guideCan I build it here?

Can a Highgate basement cinema have stepped seating?

Often, if the ceiling allows a step behind the front row.

We draw the rows before fixing the slab level.

Does a Haringey side Highgate cinema have a storey limit?

DM18 sets no fixed count.

Stability, drainage, trees and neighbours decide what is sensible.

Why put a lobby before a Highgate cinema room?

It keeps light and sound from the house out.

The doors seal, so films stay inside the room.

Will a Camden side Highgate cinema need a management plan?

Generally yes, for a new basement.

It covers deliveries, hours and how the site runs.

Tell us about your home in Highgate.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?