Postcode checkerPrime London

Can I build it here?

Enter the postcode and the work. See the council, its rules, the time on site and a value band.

i The checker

Two questions. One answer.

The work

This is a guide, not planning advice. Every site is checked properly before we price it.

ii The rules everywhere

What applies in every council.

Some rules are national. Each council then adds its own.

Checked 25 October 2026. Each line links to its source.

iii The steps

From an idea to a start on site.

  1. Check the council and the rulesFind which council covers the house. Read its rules for the work you want.
  2. Book a free visitNick visits the house. He tells you plainly what looks possible.
  3. Get a budget estimateOur quantity surveyor prices the brief. It typically follows within seven days.
  4. Design and applyOur architectural team draws the scheme. We apply for planning, or confirm it is not needed.
  5. Serve party wall noticesNotices go to the neighbours, one or two months ahead of the work.
  6. Agree the price and the programmeA cost plan is built line by line from the drawings. The programme is fixed with it.
  7. Start on siteConditions are discharged, the construction plan is agreed, and the build begins.

iv Questions

What people ask us.

Do I need planning permission for a basement in Kensington?

Yes. Kensington and Chelsea treats a new basement as development needing permission.

Policy CD11 allows one storey, under no more than half of each garden.

A Construction Traffic Management Plan goes in with the application.

Source: Kensington and Chelsea Local Plan 2024, Kensington and Chelsea Basements SPD, April 2016

Can I build a basement in Chelsea under a listed house?

No. The borough allows no excavation under a listed building.

That includes its vaults. A garden basement may still be possible.

We check the listing and the garden before anything is drawn.

Source: Kensington and Chelsea Basements SPD, April 2016

How big can a basement be in Westminster?

Policy 50 allows one storey below the lowest original floor.

It may run under no more than half the garden.

A citywide Article 4 direction removes basement permitted development.

Source: Westminster City Plan 2019 to 2040, January 2026 edition, Westminster City Council, Article 4 Directions in Westminster

Can I dig a basement in Fulham?

Often, with planning permission. Policy DC11 allows one storey.

It may reach half the house’s depth and half the garden’s.

An Article 4 direction has covered basements since April 2018.

Source: Hammersmith and Fulham Local Plan 2018, Hammersmith and Fulham basement Article 4 Direction, confirmation notice

Is a rear extension permitted development in London?

Sometimes. A single storey may reach 3 metres, or 4 metres if detached.

Prior approval can take that to 6 or 8 metres.

That larger route does not apply in a conservation area. Flats have no such rights.

Source: Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, General Permitted Development Order 2015, Article 2

Do I need planning permission for a loft in a conservation area?

Usually, yes. Roof permitted development does not apply in a conservation area.

Most of Kensington, Chelsea and Westminster is conservation area.

A mansard is drawn and applied for with the council.

Source: Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Royal Borough of Kensington and Chelsea, Conservation areas, Westminster City Council, Conservation areas

Do I need a party wall agreement for a basement?

Almost always. Digging near a neighbour needs notice under the Party Wall etc. Act 1996.

Excavating within 3 or 6 metres needs one month’s notice.

Work to the party wall itself needs two months.

Source: GOV.UK, The Party Wall etc. Act 1996: explanatory booklet, Party Wall etc. Act 1996, section 3

What is an Article 4 direction?

It is a council order that removes some permitted development rights.

Work it covers then needs a planning application.

Westminster, Hammersmith and Fulham and Camden each have one for basements.

Source: Westminster City Council, Article 4 Directions in Westminster, Hammersmith and Fulham basement Article 4 Direction, confirmation notice, Camden Planning Guidance: Basements, January 2021

Can I build a basement in Hampstead?

Camden’s Policy A5 allows one storey, never under an existing basement.

It must not exceed half of each garden.

A Basement Impact Assessment is audited independently, at the applicant’s cost.

Source: Camden Local Plan 2017, Camden Planning Guidance: Basements, January 2021

How long does a London basement take to build?

Typically 12 to 16 months on site, by our own programme model.

Design, planning and party wall notices come before that.

We set out your programme after a free visit.

Every site is different. We check yours.

Nick visits, and tells you plainly what looks possible. The visit is free.

Send us a messageCall 020 7731 6841

This is a guide, not planning advice. Every site is checked properly before we price it.