Bathroom in dramatic grey marble with mirrored walls.

MEP services in Pimlico.

Belgravia · SW1 · Belgravia apartment, full refurbishmentCompleted work, photograph

Most Pimlico homes are flats in stucco terraces. We upgrade their boilers, wiring and bathrooms within the building’s rules.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

Flats in a planned estate.

SW1V
Stucco terraces facing garden squares
Conservation area
The Pimlico Conservation Area protects it
Unbroken roofs
Rooftop plant is hard to place

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle mechanical, electrical and plumbing in Pimlico SW1V, under one contract. MEP is priced from the drawings, after a survey of what is there. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Pimlico was laid out as one estate, in the same era as Belgravia. White stucco terraces face garden squares. Most are now split into flats.

A whole house is the exception here. So most of our work is inside one flat. A boiler swap, a rewire, a new bathroom, or all three.

Bathrooms move the hardest. Waste needs a fall to the stack, and the stack rarely moves. We plan layouts around it, and use a pump only as a last resort.

Roof lines are mostly unbroken, and Westminster refuses roof additions on such terraces. That makes visible rooftop plant a hard case too. Comfort cooling is usually kept inside, with outlets placed discreetly.

No Westminster Article 4 direction on minor house alterations names Pimlico. But flats have no householder permitted development rights anyway.

What the council allows in Pimlico.

Council
City of Westminster, under its City Plan of January 2026.
Conservation area
Pimlico is protected by the Pimlico Conservation Area.
Flats
Flats and maisonettes have no householder permitted development rights.
Roofs
Roof extensions are refused on complete terraces with largely unaltered roof lines.
Apartments
The lease and the managing agent decide what can change. They also set working hours.

Source: Westminster’s conservation area summaries, with its City Plan of January 2026. Read on 25 October 2026. Policies change, so we read them again for your address.

What MEP costs in Pimlico.

A Pimlico flat is priced from drawings, after surveying the stack and supplies.

Bathroom, heating and wiring are quoted separately, so you can phase them.

Open the calculatorThe 2026 cost guide

Can a Pimlico flat bathroom move to another room?

Sometimes, if the waste can reach the stack with enough fall.

Otherwise a pump is possible, but we treat it as a last resort.

Does a Pimlico flat need the managing agent’s consent for a new boiler?

Usually. The lease decides what can change.

The flue position on a stucco front needs particular care.

Can comfort cooling be added to a Pimlico flat?

Often, with indoor units in ceiling voids.

The outdoor unit needs planning, as flats have no permitted development.

Does any Article 4 direction limit services work on a Pimlico house?

No Westminster Article 4 on minor house alterations names Pimlico.

The conservation area still applies to changes seen from the street.

Tell us about your home in Pimlico.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?