Cinema room with a deep corner sofa and copper shelving.

MEP services in Belgravia.

Belgravia · SW1 · Belgravia apartment, full refurbishmentCompleted work, photograph

Rewiring and replumbing listed Belgravia homes. The plaster, joinery and floors stay unharmed.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

Through listed walls, carefully.

SW1X · SW1W
Listed stucco terraces and mews
Section 7
Consent for works affecting character
Grosvenor
Estate licence beside the council’s

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle mechanical, electrical and plumbing in Belgravia SW1, under one contract. MEP is priced from the drawings, after a survey of what is there. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Much of Belgravia’s stock is listed. Its services are usually old, and the fabric around them is precious. Renewing one without harming the other is the job.

Listed building consent is needed for works affecting a listed building’s character. New cable and pipe routes can count, if they cut cornices, boards or panelling. So we survey the historic fabric first.

Where we can, routes follow earlier service runs, voids and later partitions. Lifting floorboards is planned, numbered and reversible. Chasing into original plaster is a last resort.

Much of the freehold is the Grosvenor estate. A leaseholder usually needs the estate’s licence as well as council consent. Our drawings go to both.

We refurbished a 2,000 sq ft apartment here, under one contract. Its cinema room shows how much a home now asks of its services.

What the council allows in Belgravia.

Council
City of Westminster, acting as listed building authority.
Listed buildings
Consent is needed for any works affecting a listed building’s character.
Plant
Lightwells, vents, skylights and plant must be sensitively designed and discreetly located.
Heat pumps
Class G permitted development does not apply on a listed building.
The estate
Where the Grosvenor estate is the freeholder, its licence usually sits beside council consent.

Source: The Listed Buildings Act 1990, section 7, and Historic England’s advice note 16. Read on 25 October 2026. Policies change, so we read them again for your address.

What MEP costs in Belgravia.

MEP in a listed house is priced from drawings, after a fabric survey.

Routes are agreed first, because they set the labour and the making good.

Open the calculatorThe 2026 cost guide

Do new pipes in a listed Belgravia house need consent?

They can, if the routes affect the building’s character.

Cutting cornices, panelling or original boards is the usual trigger.

We agree routes with the council before work starts.

Can a heat pump serve a listed Belgravia house?

Not under permitted development. Class G does not apply on a listed building.

An application may still succeed with a discreet position.

Does the Grosvenor estate approve services work in Belgravia?

Often, where it is the freeholder.

Its licence usually sits beside council consent.

We send both the same drawings.

How are floorboards lifted in a listed Belgravia room?

Each board is numbered, lifted with care and refixed in place.

Routes are planned so the fewest boards move.

Tell us about your home in Belgravia.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?