
Luxury refurbishment in St John’s Wood.
Marylebone · W1 · Marylebone listed apartmentCase study
St John’s Wood villas and stucco houses, renewed throughout. Westminster’s retrofit rules, designed in from the start.
Renewing a St John’s Wood villa rather than replacing it.
- NW8
- Villas, semi-detached and detached
- Policy 43
- Westminster puts retrofit first
- 7 days
- A budget estimate, typically
NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle luxury refurbishment in St John’s Wood NW8, under one contract. Nick prices a full renovation after a free visit. Call 020 7731 6841, and a budget estimate typically follows within seven days.
St John’s Wood was laid out as villas in gardens, rather than terraces.
Most of it has been a conservation area since 1967.
Westminster now puts retrofit first, and favours keeping a good building.
Substantial demolition must pass a sequential test, backed by an audit.
So we renew the house we have. Structure, services and rooms, under one contract.
What the council allows in St John’s Wood.
- Council
- City of Westminster, under its City Plan as revised in January 2026.
- Retrofit first
- Policy 43. Reusing a building is the priority, and supported in principle.
- Demolition
- Substantial demolition faces a four-step test, shown in a Pre-Redevelopment Audit.
- Heritage
- Policy 44. Work must preserve or enhance the conservation area’s character.
- Basements
- Policy 50. One storey below the lowest original floor, under half the garden.
Source: Westminster’s City Plan, January 2026 edition, Policies 43, 44 and 50. Read on 5 October 2026. Policies change, so we read them again for your address.
Refurbished under Westminster’s plan.

Marylebone·Apartment
Marylebone listed apartment
A Grade II listed apartment in Westminster, refurbished under the same City Plan.
See the project
Mayfair·Apartment
Mayfair apartment
A Mayfair apartment in Westminster, refitted room by room.
See the projectCase study
What a luxury refurbishment costs in St John’s Wood.
A detached villa carries more façade, roof and garden than a terrace.
Most St John’s Wood refurbishments finish at prime or super prime.
Fees, VAT and contingency are extra.
What St John’s Wood owners ask about refurbishment.
In St John’s Wood
- Every service in Hampstead and St John’s Wood
- Design and build in St John’s Wood
- Interior design in St John’s Wood
- MEP services in St John’s Wood
- Luxury painting and decorating in St John’s Wood
Refurbishment nearby
- Luxury refurbishment across London
- Luxury refurbishment in Belgravia
- Luxury refurbishment in Holland Park
- Luxury refurbishment in Knightsbridge
- Luxury refurbishment in Marylebone
- Luxury refurbishment in Mayfair
- Luxury refurbishment in Notting Hill
- Luxury refurbishment in Fulham
- Luxury refurbishment in Chelsea
- Luxury refurbishment in Kensington
- Luxury refurbishment in South Kensington
- Luxury refurbishment in Hampstead
- Luxury refurbishment in Highgate
- Luxury refurbishment in Primrose Hill
- Luxury refurbishment in Earl’s Court
- Luxury refurbishment in Pimlico
- Luxury refurbishment in Westminster
- Luxury refurbishment in Weybridge
- Luxury refurbishment in Cobham
- Luxury refurbishment in Oxshott
- Luxury refurbishment in West London
- Luxury refurbishment in South West London
- Luxury refurbishment in North London
- Luxury refurbishment in South London
- Marylebone, Bayswater and Maida Vale
- Islington, Highgate and Primrose Hill
- Mayfair
Further reading, from the blog
Will Westminster let me demolish and rebuild in St John’s Wood?
It is hard. Policy 43 puts retrofit first.
Substantial demolition must pass a four-step sequential test.
Refurbishing the existing villa is supported in principle.
Does retrofit help a heritage application in St John’s Wood?
It can. Westminster gives significant weight to keeping the building.
Harm to heritage must still be avoided or kept to a minimum.
We set that out in a Retrofit Plan.
Is there a St John’s Wood Neighbourhood Plan?
No plan has been made. Work on one was paused in 2017.
Decisions follow Westminster’s City Plan and the conservation area audit.
Can I add a basement when refurbishing in St John’s Wood?
Usually, under Policy 50. One storey below the lowest original floor.
It may cover no more than half the garden.
At least one metre of soil goes back on top.
What does a St John’s Wood refurbishment cost?
Nick prices a full renovation after a free visit.
Send the address and we price the villa as it stands.
See it builtNear St John’s Wood
See it built.
Finished homes, designed, priced and built by NU.

Knightsbridge · SW1 Townhouse
Knightsbridge townhouse, pool and wine room
A private townhouse taken from survey to handover by one team.
Case study

Belgravia · SW1 Apartment
Belgravia apartment, full refurbishment
A Belgravia apartment refurbished throughout, with kitchen and bathroom fit-out.
Case study

Kensington · W8 Townhouse
Kensington townhouse, whole house refurbishment
A Kensington townhouse refurbishment, delivered through one design and build service.
Case study
Tell us about your home in St John’s Wood.
Your name and one way to reply are enough. It goes straight to the studio.
- Already have an architect or designer? We build to their design. Working with your designer
- An NDA on request, and your home is never published without your consent. How we work in confidence