
Party wall surveyors in Notting Hill.
Kensington · W8 · Kensington new-build housesCase study
Party wall notices and awards for Notting Hill terraces and flats. Run by the team that designs and builds the work.
A Notting Hill terrace, five floors of shared wall.
- Terraces
- Tall, narrow and joined on both sides
- 12 months
- Before an unused notice lapses
- CD11, 2024
- The borough’s basement policy
NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle party wall notices and awards in Notting Hill W11, under one contract. Fees are priced per project by our own quantity surveyor, from the actual scope. Call 020 7731 6841, and a budget estimate typically follows within seven days.
Notting Hill terraces are tall and narrow. Most run four floors over a lower ground.
So the party wall is tall too. Work at the top or the bottom touches both neighbours.
Many houses are now flats. One project can mean notices above, below and beside.
Lowering a lower ground floor underpins the shared walls. That is two months’ notice.
We record each neighbour’s rooms first, then agree the award before anyone digs.
What the Act and the borough ask in Notting Hill.
- Council
- Royal Borough of Kensington and Chelsea. Its eastern edge meets Westminster.
- Underpinning
- Underpinning or thickening a party wall is notifiable, at two months’ notice.
- Flats
- Floors between flats are party structures under the Act.
- Basements
- Policy CD11. One storey, under no more than half of each garden.
- On site
- The borough’s Code of Construction Practice governs noise, hours and site traffic.
- Lapse
- Notices lapse if work has not started within twelve months.
Source: The Party Wall etc. Act 1996, and Kensington and Chelsea’s Local Plan 2024, Policy CD11. Read on 6 October 2026. Policies change, so we read them again for your address.
Below ground, in the same borough.

Kensington·New build
Kensington new-build houses
Piled walls beside the neighbours, for two houses in the same borough.
See the project
Chelsea·Townhouse
Chelsea townhouse, opened up and fitted out
A Chelsea townhouse with a new basement under its whole footprint.
See the projectCase study
What a party wall surveyor costs in Notting Hill.
Party wall work is priced per project, from the actual scope.
A house split into flats can mean several owners, and several notices.
What Notting Hill owners ask about party walls.
In Notting Hill
- Every service in Notting Hill and Holland Park
- Basement construction in Notting Hill
- House extensions in Notting Hill
- Loft conversion in Notting Hill
- Planning consultants in Notting Hill
Party walls nearby
- Party wall surveying across London
- Party wall surveying in Holland Park
- Party wall surveying in Fulham
- Party wall surveying in Knightsbridge
- Party wall surveying in Kensington
- Party wall surveying in Chelsea
- Party wall surveying in South Kensington
- Party wall surveying in Belgravia
- Party wall surveying in Mayfair
- Party wall surveying in Marylebone
- Party wall surveying in St John’s Wood
- Party wall surveying in Hampstead
- Party wall surveying in Highgate
- Party wall surveying in Primrose Hill
- Party wall surveying in Earl’s Court
- Party wall surveying in Pimlico
- Party wall surveying in Westminster
- Party wall surveying in Weybridge
- Party wall surveying in Cobham
- Party wall surveying in Oxshott
- Party wall surveying in West London
- Party wall surveying in South West London
- Party wall surveying in North London
- Party wall surveying in South London
- Kensington
- Marylebone, Bayswater and Maida Vale
- Earl’s Court
Further reading, from the blog
Does lowering my Notting Hill lower ground floor need notice?
Usually, yes. It often means underpinning the party walls.
That takes a party structure notice, two months ahead.
Who do I notify in a Notting Hill house split into flats?
Each owner whose wall or floor the work touches.
Above, below and beside can all be adjoining owners.
We check the titles first.
When should party wall notices go out for a Notting Hill basement?
Once the design is fixed, and before the build starts.
A notice lapses after twelve months if work has not begun.
So we time it to the programme.
What happens if work damages a Notting Hill neighbour’s house?
The award sets how damage is put right, or paid for.
The schedule of condition shows what was there before.
That is why we record it in detail.
Does a Notting Hill loft need a party wall notice?
Usually. Steels for a loft often bear on the shared walls.
Raising a party wall for a mansard needs notice too.
See it builtNear Notting Hill
See it built.
Finished homes, designed, priced and built by NU.

Fulham · SW6 Basements
Fulham basements
Basements we have dug and built under Fulham houses, close to our studio.
Case study

Chelsea · SW3 Townhouse
Chelsea basement and extension
A new basement, a kitchen extension and a full interior renovation.
Case study

Fulham · SW6 New build
Fulham, four new-build houses with basements
Four architect designed houses, each with a basement, built as a joint venture.
Case study
Tell us about your home in Notting Hill.
Your name and one way to reply are enough. It goes straight to the studio.
- Already have an architect or designer? We build to their design. Working with your designer
- An NDA on request, and your home is never published without your consent. How we work in confidence