A lower floor under construction, with concrete piles, steel props and ventilation ducts.

Party wall surveyors in Notting Hill.

Kensington · W8 · Kensington new-build housesCompleted work, photograph

Party wall notices and awards for Notting Hill terraces and flats. Run by the team that designs and builds the work.

A Notting Hill terrace, five floors of shared wall.

Terraces
Tall, narrow and joined on both sides
12 months
Before an unused notice lapses
CD11, 2024
The borough’s basement policy

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle party wall notices and awards in Notting Hill W11, under one contract. Fees are priced per project by our own quantity surveyor, from the actual scope. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Notting Hill terraces are tall and narrow. Most run four floors over a lower ground.

So the party wall is tall too. Work at the top or the bottom touches both neighbours.

Many houses are now flats. One project can mean notices above, below and beside.

Lowering a lower ground floor underpins the shared walls. That is two months’ notice.

We record each neighbour’s rooms first, then agree the award before anyone digs.

What the Act and the borough ask in Notting Hill.

Council
Royal Borough of Kensington and Chelsea. Its eastern edge meets Westminster.
Underpinning
Underpinning or thickening a party wall is notifiable, at two months’ notice.
Flats
Floors between flats are party structures under the Act.
Basements
Policy CD11. Every basement here has needed full planning since April 2016.
On site
The borough’s Code of Construction Practice governs noise, hours and site traffic.
Lapse
Notices lapse if work has not started within twelve months.

Source: The Party Wall etc. Act 1996, and Kensington and Chelsea’s Local Plan 2024, Policy CD11. Read on 6 October 2026. Policies change, so we read them again for your address.

What party wall surveying costs in Notting Hill.

Party wall work is priced per project, from the actual scope.

A house split into flats can mean several owners, and several notices.

None of it sits in our per square foot construction bands.

Open the calculatorThe 2026 cost guide

Does lowering my Notting Hill lower ground floor need notice?

Usually, yes. It often means underpinning the party walls.

That takes a party structure notice, two months ahead.

Who do I notify in a Notting Hill house split into flats?

Each owner whose wall or floor the work touches.

Above, below and beside can all be adjoining owners.

We check the titles first.

When should party wall notices go out for a Notting Hill basement?

Once the design is fixed, and before the build starts.

A notice lapses after twelve months if work has not begun.

So we time it to the programme.

What happens if work damages a Notting Hill neighbour’s house?

The award sets how damage is put right, or paid for.

The schedule of condition shows what was there before.

That is why we record it in detail.

Does a Notting Hill loft need a party wall notice?

Usually. Steels for a loft often bear on the shared walls.

Raising a party wall for a mansard needs notice too.

Tell us about your home in Notting Hill.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Optional, it helps us prepare
What is the work?