Open plan living, dining and kitchen with tall bay windows.

Party wall surveyors in Mayfair.

Mayfair · W1 · Mayfair apartmentCompleted work, photograph

Party wall notices for Mayfair apartments and mews houses. From the team that plans and builds the work.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

Mayfair apartments, joined through the wall.

Lateral
Flats joined through a shared wall
Shops below
Their owners can be adjoining owners
W1
Covered by a conservation area

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle party wall notices and awards in Mayfair W1, under one contract. Fees are priced per project by our own quantity surveyor, from the actual scope. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Mayfair’s Georgian townhouses are mostly apartments now. Shops often fill the ground floor.

A lateral flat joins two buildings side by side. That means a new opening through the party wall.

Cutting into a party wall needs two months’ notice. Every owner of that wall must receive it.

Below you, the shop’s owner may count as an adjoining owner. So may the freeholder above.

Behind the main streets sit mews houses. Their walls are shared closely, so most structural work is notifiable.

What the council allows in Mayfair.

Council
City of Westminster, for planning. The Mayfair Neighbourhood Plan was made in December 2019.
Openings
Cutting into a party wall for a lateral flat takes two months’ notice.
Owners
Freeholders and long leaseholders of the wall or floor each count as owners.
Floors
A floor dividing your flat from a shop below is a party structure.
The lease
An award does not replace the landlord’s licence. Both are needed.

Source: The Party Wall etc. Act 1996, and the GOV.UK explanatory booklet. Read on 25 October 2026. Policies change, so we read them again for your address.

What a party wall surveyor costs in Mayfair.

Each Mayfair job is priced once the titles and owners are known.

More owners mean more notices, and a little more time.

Open the calculatorThe 2026 cost guide

Does joining two Mayfair flats sideways need party wall notice?

Yes. The opening cuts through the wall the buildings share.

That is party structure work, at two months’ notice.

Is the shop under my Mayfair flat an adjoining owner?

Often. The floor between you divides two ownerships.

Its owner may then need notice for structural work to that floor.

Does a Mayfair landlord’s licence cover party wall matters?

No. The licence is consent under your lease.

The Act deals with the neighbours. We run both at once.

How long do Mayfair neighbours have to answer a notice?

Fourteen days. Silence then counts as a dispute.

Surveyors are appointed, and they agree an award.

Tell us about your home in Mayfair.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?