Swimming pool lined in marble with a lit ceiling above.

Party wall surveyors in Knightsbridge.

Knightsbridge · SW1 · Knightsbridge townhouse, pool and wine roomCompleted work, photograph

Party wall notices and awards for Knightsbridge flats and townhouses. Handled by the team that builds the work.

Knightsbridge walls, with many owners behind them.

Many owners
Each long leaseholder can be one
Two councils
Planning differs, the Act does not
1 month
Notice for a nearby excavation

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle party wall notices and awards in Knightsbridge SW1X, under one contract. Fees are priced per project by our own quantity surveyor, from the actual scope. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Knightsbridge is mostly flats, in stucco terraces and mansion blocks.

In a block, the walls and floors you share may have several owners.

Under the Act, the freeholder and longer leaseholders can each be owners.

So one wall can mean several notices, each served correctly.

Townhouses here bring basements and pools. Those need excavation notices to the houses around.

What the Act asks in Knightsbridge.

Council
Kensington and Chelsea to the west and south. Westminster to the east and park side.
Adjoining owners
Freeholders, and leaseholders with more than a yearly tenancy, each receive notice.
Floors
A floor between two flats is a party structure. Work to it needs notice.
Basements
CD11 on the Kensington and Chelsea side. Policy 50 on the Westminster side. One storey.
The lease
The Act does not replace the landlord’s licence. Both are needed.
Appeals
Either side can appeal an award to the county court within 14 days.

Source: The Party Wall etc. Act 1996, Kensington and Chelsea’s Policy CD11, and Westminster’s City Plan Policy 50. Read on 6 October 2026. Policies change, so we read them again for your address.

What party wall surveying costs in Knightsbridge.

Party wall work is priced per project, once the owners are known.

A block with many adjoining owners means more notices, and more time.

None of it sits in our per square foot construction bands.

Open the calculatorThe 2026 cost guide

Who gets a party wall notice in a Knightsbridge mansion block?

Every adjoining owner of the wall or floor you work on.

That can mean the freeholder and several long leaseholders.

We check the titles before serving, so none is missed.

Is a floor between Knightsbridge flats a party wall?

Under the Act, it is a party structure. So the same rules apply.

Steels, new openings or structural work to it need notice.

Does a party wall award replace the freeholder’s licence in Knightsbridge?

No. The award settles the neighbours’ side under the Act.

The licence is the landlord’s consent under your lease.

We work on both at once.

Can a Knightsbridge neighbour appeal a party wall award?

Yes, to the county court, within 14 days of service.

It is rare. A well run award leaves little to appeal.

How much notice does a Knightsbridge basement need?

One month for the excavation. Two months for work to a shared wall.

A pool or plant room below ground usually needs both.

Tell us about your home in Knightsbridge.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Optional, it helps us prepare
What is the work?