Media room panelled in deep green with a fitted screen.

Basement conversion and construction in Earl’s Court.

Chelsea · SW3 · Chelsea terraced houseCompleted work, photograph

Earl’s Court basements are mostly about lower ground flats. We say early what CD11 allows, and what it does not.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

Earl’s Court basements start at the lower ground.

CD11
One storey, under half the garden
Listed
No digging beneath, vaults included
HO1
Two flats may not become one

NU Projects is a design and build company in Fulham SW6, founded in 2010. We handle basement conversion and construction in Earl’s Court SW5, under one contract. A new basement dig typically runs £500k to £900k. Converting an existing basement runs £180k to £300k. Call 020 7731 6841, and a budget estimate typically follows within seven days.

Earl’s Court is tall stucco terraces and red brick mansion blocks. Most were split into flats long ago.

So the usual basement brief is a lower ground flat wanting more room. Sometimes old cellars or vaults already exist.

Policy CD11 allows one storey of basement, under no more than half the garden. Converting existing space is often the realistic route.

Under a listed building, no excavation is allowed at all. That includes its vaults.

Policy HO1 does not let homes be merged. So a lower ground flat cannot simply join the flat above.

What the council allows in Earl’s Court.

Council
Royal Borough of Kensington and Chelsea, under its Local Plan 2024.
Policy CD11
One storey of basement, under no more than half of each garden.
Listed houses
No excavation under a listed building, including its vaults.
Flats
Policy HO1 does not allow existing self-contained homes to be merged into one.
Flood risk
Every basement in the borough needs a flood risk assessment.
On site
A Construction Traffic Management Plan goes in with the application.

Source: Kensington and Chelsea’s Local Plan 2024, Policies CD4, CD5, CD11 and CD13. Read on 3 October 2026. Policies change, so we read them again for your address.

What a basement costs in Earl’s Court.

£180k to £300kConverting an existing basement. A project total, from our 2026 cost guide.

£500k to £900k+Digging a new basement. A project total, from our 2026 cost guide.

Most Earl’s Court work sits nearer the conversion figure than the new dig.

Both are project totals. Fees, party wall costs, contingency and VAT sit outside them.

Open the calculatorThe 2026 cost guideBasement costs in fullCan I build it here?

Can I dig a basement under a listed house in Earl’s Court?

No. The borough allows no excavation under a listed building.

That includes its vaults. We look at the existing lower ground instead.

Can an Earl’s Court lower ground flat join the flat above?

Not usually. Policy HO1 does not allow homes to be merged.

Extra space has to come within the flat itself.

What goes in with an Earl’s Court basement application?

A Construction Traffic Management Plan and a flood risk assessment.

Considerate Constructors membership is then set by planning condition.

What does an Earl’s Court basement conversion cost?

Converting existing space is £180k to £300k in our 2026 cost guide.

A new dig is £500k to £900k and more. Both are project totals.

Tell us about your home in Earl’s Court.

Your name and one way to reply are enough. It goes straight to the studio.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?