Design and build company in London. Designers, a quantity surveyor and builders, under one contract.
A surveyor or QS often meets clients with a problem but no vision.
The client owns a house. It needs work. Nobody has drawn it yet.
That is exactly where design and build makes the most difference.
Here is how one contract handles it from feasibility to handover.
Start with what the client actually needs
The first step is not to draw. It is to understand.
What does the problem actually cost to solve?
What is the client’s budget and timeline?
What constraints does the building impose?
A feasibility phase answers these questions before the design starts.
That prevents spending months on a design that cannot be afforded or built.
Design by people who will build it
Design and build puts drawing and construction in the same team.
The architect knows what the builder will charge to build.
The builder knows what the architect has drawn.
No drawings arrive at tender that cannot be built to budget.
That discipline changes everything about feasibility and cost certainty.
One contract, one point of accountability
With separate firms, blame passes. The architect blames the builder.
The builder blames the MEP engineer. Everyone blames the surveyor.
With one contract, there is nowhere to pass the blame.
One team delivers feasibility, design, costing and construction. Here is what a contractor owes at tender. Design and build puts that accountability on the same side.
The phases from day one to handover
Phase one is feasibility. Understand the problem and the budget.
Phase two is design. Develop solutions that fit the budget.
Phase three is planning and approvals. If needed, they are costed in.
Phase four is construction. The designed solution is now built.
Phase five is handover. Everything is snagged, certified and handed over.
One team carries all five phases. One programme holds them together.
No handing over between firms. No restarting the clock.

Where the risk actually sits
In a traditional route, risk is split between multiple firms.
The architect designs. The builder builds. The engineer certifies.
The client carries the risk of coordination failures.
In design and build, the contractor carries coordination risk.
That is why the contractor must design something they can build.
And why costing must be honest from the start.
Cost certainty is real, not hoped
Design and build on one contract is priced open-book.
The client sees what is measured and what is assumed.
Nothing is hidden inside a contingency allowance.
If the design changes, the cost change is immediate and clear.
The client understands the cost before work starts, not after.

Why this matters for clients with no drawings
A client with no drawings cannot compare bids for a design.
They cannot know if the design is affordable until it exists.
Design and build solves this by designing to the budget.
Feasibility first, design to fit, then costing.
By the time the client sees drawings, they know the cost.
The role of the surveyor or QS
Your role is to advise the client what is wise.
Design and build is wise when the client has no drawings.
It is wise when the client wants one accountable team.
It is wise when blame-passing costs time before it costs money. Here is why architect and contractor need to work as one. Design and build makes that the structure of the whole job.
Got a client with a house and no drawings?Fill out the contact form or call 020 7731 6841 and let’s get you booked in for a free call with Nick.
This is the work we do. Design and build company in London, or ask for a cost estimate.