Building on the Crown Estate. Regent’s Park.

Marylebone W1 · listed apartment, near the parkCase study

Leases, listing, two councils and the Paving Commission, from official sources.

Talk to NickHe calls you back within the hour, in working hours

Or call 020 7731 6841We use your details only to reach you. Privacy note

In short.

The Crown Estate keeps long-term ownership of its Regent’s Park homes. Most are let on long leases. Many sit in Grade I Nash terraces. Works need the landlord’s consent under your lease, plus listed building consent. Road and scaffold licences come from a separate body.

Planning authority: Westminster or Camden, depending on the terrace.

This guide summarises published documents, read on 19 November 2026. Your lease decides. Check the current documents before you apply.

Who gives consent.

The Crown Estate holds long-term ownership of its residential homes.

Most are let on long leases. Your lease sets what needs consent.

The Crown Estate publishes no alterations guide for these homes.

So ask its residential team early, and read your lease closely.

Listed terraces, two councils.

Regent’s Park is a Grade I registered park.

The Nash terraces are listed, several at Grade I.

Some sit in Westminster, others in Camden.

Check which council covers your terrace before you draw anything.

Listed building consent is separate from planning, and can cover internal works.

Works to a listed building without consent are a criminal offence.

The Crown Estate Paving Commission.

The Paving Commission is a separate body, set up by an Act of 1824.

It looks after the roads, footways and gardens around the park.

It does not approve building alterations.

But contractors need its licences to work on its roads.

  • Scaffolding anywhere on the estate needs a licence
  • Hoardings need a licence
  • Opening up a pavement or road needs a licence
  • Skips and wait-and-load are restricted, so take advice first

Apply at least seven days ahead, and two weeks for scaffolding. Method statements and public liability cover come first.

Paving Commission fees.

  • Scaffold, hoarding or welfare unit: £62.50 a week
  • Parking suspension: £83.33 a day
  • Skip or wait-and-load: £36.67 a day
  • Administration: £85 a licence
  • A damage deposit for each property

All excluding VAT, as published by the Commission.

Working hours.

  • Westminster: 8am to 6pm weekdays, 8am to 1pm Saturdays
  • Westminster: piling, excavation and demolition on weekdays only
  • Camden: 8am to 6pm weekdays, 8am to 1pm Saturdays
  • No noisy work on Sundays or bank holidays in either

Your lease or planning conditions can be stricter.

Basements under a listed home.

Camden says a basement under a listed building needs listed building consent.

That holds even where planning permission is not needed.

Westminster’s Policy 50 asks that it keeps the house’s original hierarchy of rooms.

Both councils limit a basement to one storey in most cases.

The order of consents.

  1. 01

    Read your lease. Find any head lessor or residents’ company, whose consent comes first.

  2. 02

    Talk to the estate early, before drawings are fixed.

  3. 03

    Apply for planning permission and listed building consent from the council.

  4. 04

    Serve party wall notices: two months for party walls, one month for excavation.

  5. 05

    Get Building Regulations approval from the council or an approved inspector.

  6. 06

    Meet the estate’s conditions, complete the licence, then start on site.

How we help.

NU Projects designs, prices and builds prime London homes under one contract.

We prepare the drawings, structural details and method statements an estate asks for.

We run planning, listed building consent, party wall and building control alongside.

What homeowners ask.

Does the Crown Estate still own the Regent’s Park terraces?

Yes, on its own account. The Crown Estate says it holds long-term ownership of its residential homes. Most are at Regent’s Park.

Does the Crown Estate Paving Commission approve building works?

No. It is a separate body. It issues licences for scaffolding, hoardings, skips and road openings. Building consent comes from your landlord and the council.

Which council covers a Nash terrace at Regent’s Park?

It depends on the terrace. Some are in Westminster and others in Camden. Check yours before applying.

How much notice does the Paving Commission need for scaffolding?

Apply at least seven days before the start date. Allow two weeks for scaffolding.

Talk to Nick about your house.

Your name and one way to reply are enough. Tell us the area and what you want to build.