In short.

Cadogan owns about 93 acres of Chelsea and Knightsbridge. Most alterations need a licence to alter from the estate. No work should start until that licence is completed. Kensington and Chelsea council rules apply alongside.

Planning authority: the Royal Borough of Kensington and Chelsea.

This guide summarises published documents, read on 19 November 2026. Your lease decides. Check the current documents before you apply.

Who gives consent.

Your lease decides what you may alter, and with whose consent.

Where there is a head lease, ask your immediate landlord first.

Cadogan’s Building Surveying department reviews the application.

Final plans go to the Estate Board before solicitors draw the licence.

The current rules are Cadogan’s licence to alter guidelines of June 2023.

What Cadogan asks to see.

  • Existing and proposed drawings, numbered and dated, as PDFs
  • Drainage, waste, extract and vent routes
  • All floor finishes
  • A structural report and calculations for structural works
  • An acoustic report for any air conditioning plant
  • Access, scaffold and common-parts protection
  • Copies of the planning, listed building and Building Regulations applications
  • Contractor details, with a full-time foreman on larger works
  • A draft EPC, then the registered EPC on completion

Costs.

  • An estate administration charge of £1,000 plus VAT
  • Solicitors’ fees, typically £1,800 to £2,000 plus VAT for a routine licence
  • Third-party structural, services or acoustic review fees
  • A schedule of condition of the common parts
  • A managing agent’s charge of £1,000 plus VAT, where there is one
  • A deposit against damage to common parts, set case by case

You give an undertaking for costs, payable even if the application stops.

Timescales.

  • Estate comments within five working days, longer for complex schemes
  • Formal licences concluded within 90 days of full information, as an aim
  • An application lapses if not completed within six months

Standards the estate sets.

  • Every alteration must reach at least EPC rating B
  • LED lighting throughout
  • Cast-iron soil and rainwater pipes, and no new external pipes
  • Lead or asphalt flat roofs, never felt
  • No pumped waste systems
  • Carpet in flats, except wet rooms and kitchens
  • Hard floors only where the lease allows, with sound tests before and after

Working hours.

  • Kensington and Chelsea’s Code of Construction Practice applies
  • Audible work 8am to 6pm, Monday to Friday only
  • No audible work on Saturdays, Sundays or public holidays
  • Demolition and concrete breaking: 9am to noon and 2pm to 5.30pm

Cadogan may cut high-impact hours further, and its decision is final.

Basements.

Cadogan’s guidelines set no basement policy of their own.

Kensington and Chelsea’s Local Plan Policy CD11 applies instead.

It allows one storey, under no more than half of each garden.

It does not allow digging under a listed building.

A basement dig is Category 1 under the council’s construction code.

That needs an approved site construction management plan and a yearly bond.

The order of consents.

  1. 01

    Read your lease. Find any head lessor or residents’ company, whose consent comes first.

  2. 02

    Talk to the estate early, before drawings are fixed.

  3. 03

    Apply for planning permission and listed building consent from the council.

  4. 04

    Serve party wall notices: two months for party walls, one month for excavation.

  5. 05

    Get Building Regulations approval from the council or an approved inspector.

  6. 06

    Meet the estate’s conditions, complete the licence, then start on site.

How we help.

NU Projects designs, prices and builds prime London homes under one contract.

We prepare the drawings, structural details and method statements an estate asks for.

We run planning, listed building consent, party wall and building control alongside.

What homeowners ask.

How long does a Cadogan licence to alter take?

Cadogan aims to conclude formal licences within 90 days of full information. It gives first comments within five working days.

What does a Cadogan licence to alter cost?

Expect a £1,000 estate charge plus solicitors’ fees near £1,800 to £2,000. Both carry VAT. Specialist review fees and a deposit can follow.

Can builders work on Saturdays in Chelsea?

No audible work is allowed on Saturdays under Kensington and Chelsea’s construction code. Weekday hours are 8am to 6pm.

Can I build a basement on the Cadogan estate?

Cadogan sets no basement policy of its own. The council allows one storey under half of each garden. It allows none under a listed building.

Talk to Nick about your house.

Your name and one way to reply are enough. Tell us the area and what you want to build.

A phone number or an email is enough. We only need one.

Where did you find us? Optional
Optional, it helps us prepare
What is the work?