Case studyNotting Hill · W11
Notting Hill apartment, back to the joists
A Notting Hill apartment taken back to its joists. Then finished room by room to Mariana Orsini’s design.
- Where
- Notting Hill, W11
- The home
- A period apartment
- The work
- Strip out and full renovation
- On site
- September 2024 to June 2025
- Status
- Completed
- Interior design
- Mariana Orsini

i The brief
Back to the joists, then rebuilt.
Every room was designed by our interiors team before work began.
The apartment is in a period building in Notting Hill.
We stripped it to the joists and rebuilt it.
New ceilings, herringbone oak floors and panelled walls throughout.
Two bathrooms, a study and acoustic insulation between the floors.
ii Before
The strip out.
Taken in September 2024, as the old flat came out.






iii The drawings
Every room drawn first.
Mariana Orsini drew the plan, the floors and every wall.
The colours, tiles and fittings were chosen on paper first.





iv The fit out
The design, going in.
Photographed in spring 2025, as the finishes went in.
The mural, the marble and the brass, exactly as drawn.








v Finished
Finished, as drawn.
A few of the finished rooms, photographed in June 2025.




We photographed the build and only a few finished rooms. The rest are shown as designed.
vi The rooms
Shown as designed.
Made from Mariana’s drawings and the finishes we fitted.
Visualisations, never photographs of the finished flat.




vii The team
Who built it.
- Led the project
- Nick Jeffries, founder
- Interior design
- Mariana Orsini
- Design, cost and construction
- NU Projects, under one contract
The scope Strip out Full renovation Interior design Herringbone oak floors Panelling and joinery Two bathrooms Acoustic insulation Project management
Services on this jobDesign and buildLuxury renovationsInterior designBespoke joineryConstruction project management
· The place
Building in Notting Hill.
This home sits in W11 and W2. The council is the Royal Borough of Kensington and Chelsea.
The houses Painted stucco terraces, tall and narrow. Most run four floors over a lower ground floor. Communal gardens sit behind many terraces.
Conservation Ladbroke, Pembridge and Norland are among its conservation areas.
We read these rules again for each address before design starts. See our work in Notting Hill.
· Questions
About this project.
- Where is this project?
- Notting Hill, W11. We never publish the street or the owner.
- What did NU do here?
- The work covered strip out, full renovation, interior design and herringbone oak floors. We designed, priced and built it under one contract.
- What kind of home is it?
- A period apartment.
- How long was it on site?
- September 2024 to June 2025.
- Which council decides works here?
- The Royal Borough of Kensington and Chelsea decides planning and building control.
More workNotting Hill
More near Notting Hill.

Kensington · W8 New build
Kensington new-build houses
Two new-build houses with triple basements, built under one contract.
Case study

Kensington · W8 Townhouse
Kensington townhouse, whole house refurbishment
A Kensington townhouse refurbishment, delivered through one design and build service.
Case study

Knightsbridge · SW1 Townhouse
Knightsbridge townhouse, pool and wine room
A private townhouse taken from survey to handover by one team.
Case study
Start a conversation
Tell us about your home.
Your name and one way to reply are enough. It goes straight to the studio.