Case studyChelsea · SW3
Chelsea townhouse, full refurbishment
A 2,000 sq ft Chelsea family home, refurbished throughout, with a cinema room.
- Where
- Chelsea, SW3
- The home
- Townhouse
- Size
- 2,000 sq ft
- Value band
- £500k to £1m
- Completed
- 2022
- On site
- About 60 weeks
- Joinery
- Cochrane Bespoke

i The brief
A family home, to a high specification.
The brief was a family home refurbished throughout, to a high specification.
This was our second Chelsea commission.
Every principal room was refurbished.
Every principal room, under one contract.
ii The work
Kitchen, bathrooms and joinery together.
The scope covered interior design and bespoke joinery.
Kitchen and bathroom fit-out followed.
NU Projects managed the whole process under one contract.
The joinery is by Cochrane Bespoke.
The work took about 60 weeks on site, finishing in 2022.
iii The finished house
Bronze, marble and velvet.
A cinema room with copper shelving. A family room with a media wall.






iv The team
Who built it.
- The studio
- NU Projects, founded by Nick Jeffries
- Design, cost and construction
- NU Projects, under one contract
- Joinery
- Cochrane Bespoke
The scope Interior design Full refurbishment Bespoke joinery Kitchen fit-out Bathroom fit-out Project management
Services on this jobInterior designConstruction
Start a conversation
Tell us about your home.
Your name and one way to reply are enough. It goes straight to the studio.

