A beautifully finished prime London home is the result of hundreds of connected decisions. Architecture, interiors, structure, services, approvals, procurement and craftsmanship must move in the same direction. The NU Projects process brings those responsibilities together from the first conversation to the final handover.

Stage 1: The first conversation

We begin with the property, the way the client wants to live, the desired character, the investment and the ideal programme. Honest early advice establishes whether these elements are aligned and identifies the questions that must be answered next.

Stage 2: Survey and property research

Accurate information is essential. Measured surveys, planning research, title information and specialist investigations create the base for design. Depending on the property, the team may also review structure, drainage, services, heritage significance, asbestos and access.

Stage 3: Feasibility

Feasibility turns ambition into options. The team considers planning risk, structural implications, the likely programme and an early investment framework. This is the point to test major moves before time is spent developing the wrong solution.

Stage 4: Architecture

Layouts, circulation, light, volume and the relationship between rooms are developed. The architecture is not treated as an isolated visual exercise. Structure, services, planning and construction logic are considered as the scheme evolves.

Stage 5: Interior design

Materials, kitchens, bathrooms, joinery, lighting, ironmongery, furniture and colour are coordinated with the architecture. Starting interiors early avoids compromised storage, awkward switches, late joinery changes and decorative decisions that fight the building.

Stage 6: Cost planning

The quantity surveyor measures the developing scope, tests allowances and identifies where choices have the greatest effect. The cost plan is updated as the design becomes more detailed so the client can make informed decisions before construction.

For a detailed explanation of current costs, read How Much Does a High End Home Renovation Cost in London in 2026?.

Stage 7: Planning and approvals

The route may involve planning permission, listed building consent, building control, party wall procedures, freeholder consent or a licence to alter. NU coordinates the required information and builds realistic approval periods into the programme.

Stage 8: Technical coordination

Concepts become buildable information. Structural details, waterproofing, heating, cooling, ventilation, lighting, electrical layouts, joinery and finishes are resolved together. Coordination at this stage prevents expensive clashes on site.

Stage 9: Procurement

Long lead items and specialist packages are planned around the programme. Kitchens, stone, joinery, glazing, ironmongery, lighting and equipment must be ordered with the correct approved information. Early procurement protects both quality and time.

Stage 10: Pre construction

  • The scope, cost plan and responsibilities are confirmed.

  • Site logistics, protection and neighbour management are organised.

  • The construction programme and procurement schedule are reviewed.

  • Health, safety, temporary works and statutory requirements are coordinated.

  • Client decisions and reporting procedures are agreed.

Stage 11: Construction

The site team delivers the coordinated design while the wider NU team manages quality, cost, information and progress. Regular reporting keeps the client informed, while design reviews ensure the original intent survives the practical realities of construction.

Stage 12: Commissioning, snagging and handover

A project is not finished when the last coat of paint is applied. Mechanical and electrical systems are tested, certificates and manuals are assembled, training is provided and the home is inspected in detail. Snagging is managed methodically so the client receives a properly functioning property.

Stage 13: Aftercare

NU remains available after handover. Seasonal adjustments, minor settlement and questions about new systems are normal parts of occupying a renovated home. Clear aftercare completes the relationship responsibly.

Why an integrated team changes the experience

With separate appointments, information can move slowly between consultants, contractor and specialists. NU Projects creates one accountable route. Design is informed by construction, cost is informed by the real scope and site delivery remains connected to the people who developed the brief.

  • Clear responsibility from concept to completion.

  • Earlier identification of cost, programme and buildability risks.

  • Faster, better informed decisions.

  • Consistent design intent.

  • A calmer client experience.

Frequently asked questions

How long does a prime London renovation take?

It depends on scope, approvals, structural work, specification and procurement. The programme should be developed after the property and design are sufficiently understood.

Can NU join a project that already has an architect?

Yes. NU can review the available information and advise on design development, cost, buildability and delivery. The right structure depends on the stage and existing appointments.

How often will the client receive updates?

Reporting arrangements are agreed before construction. Progress, decisions, cost and programme should be communicated regularly and clearly.

One team. One standard. One exceptional home.

NU Projects aims to be the No 1 design and build partner for prime London clients who want creativity, craftsmanship and accountability in one place.